7th December to 12th December, 2025

Multipara Geophysical logging was conducted in four bore holes using Self-Potential, Resistivity (short normal, long normal), Natural Gamma, Induced Polarization and Magnetic Susceptibility Sonde at CPA.

15th July, 2025

As a part of Phase-I, evaluation drilling of 4500 m awarded to M/s. Rawel Singh & Co, Punjab has commenced on 15th July, 2025 within the mining lease area of Fluorspar Project, Kadipani. Drilling is planned with a depth range of 100 m to 500 m.

13th July, 2025

As a part of Phase-I evaluation drilling in the Brown Field area of the Main Ambaji block (184 Ha), second drilling contract of 15000 m awarded to M/s. M/s Geoservices Maritime Pvt. Ltd, Mumbai has been commenced on 13th July, 2025. Drilling is planned with a depth range of 500 m to 1000 m.

1st March, 2025

Phase I evaluation drilling is planned in the Brown Field area of the Main Ambaji block (184 Ha) at a close grid interval of coring boreholes, specifically at 50 m to 100 m on a diamond grid pattern, with a depth range of 300 m to 500 m. This will aid in augmenting resources and confirming the earlier results according to the requirements of mine planning and resource categorisation as 111 or 112 UNFC. Upon completion of this Phase I drilling, the deeper extension of various lodes and their lateral behaviour will be deciphered, and the shape of the ore body will be firmly delineated for mine planning. A total of 9000 m of core drilling at Ambaji was awarded to M/s. Rawel Singh & Co. and Drilling commenced on 1st March, 2025.

1st March, 2025

The renovated office and laboratory complex was inaugurated at the Ambaji mine site.